Major Listed Corporate

UPC Group constructed a 14,000m2 facility for a blue-chip tenant in 2024. Urgent timing requirements were met through collaborating with Fosters.

  • Design, consenting and build completed in under 12 months
  • Construction including earthworks in less than 8 months
  • A clear span warehouse
  • Slab loading capacity of 50kpa
  • 100 % sprinkler coverage

Efficient layout design resulted in no requirement for truck turning onsite. Entry is via the enclosed breezeway from Kohia Drive and exit onto Spence Lane.

UPC was able to meet the tenant’s urgent timing requirement by working with Foster to complete the design, consenting and build in under 12 months.

Construction including earthworks was completed in less than 8 months.

Waikato Milking Systems

UPC provided a design, build and lease solution at Northgate for Waikato Milking Systems.

9,000m2 state-of-the-art warehouse designed to future-proof their business.

Built in two stages by Downey Construction.